Tourle Street Bridge Tourle Street Bridge
Applications: Sub Surface Barrier Systems / Product: Jet Grouting

The replacement of the existing Tourle Street Bridge in Newcastle, NSW lead to new consideration for foundations to eliminate issues of driving new pre-cast piles into contaminated fill material below the groundwater level. Menard Bachy's Jet Grouting proved to be the best of breed barrier system for the project.

 
 
Tourle Street Bridge Hilton’s Dolphin Towers Surfers Paradise
Applications: Foundations / Product: Diaphragm wall and barettes

The challenging overall program for the construction of the new Hilton’s Dolphin Tower in Surfers Paradise, QLD lead the design to a 25 m deep perimetral wall wand barrettes. Menard Bachy's teams delivered the works successfully despite challenging conditions.

 
 
Abu Dhabi Pyrmont Water Police Park
Applications: Earth Retention / Product: Jet Grouting

In July 2005 the Sydney City Council the former Water Police site at Pyrmont with plans to transform the area into a new urban parkland and foreshore inlet. The works required strengthening of the existing sea wall of which Menard Bachy provided a key benefit from the design stage through to execution in construction.

 
 
Dynamic Compaction Dalrymple Bay Coal Terminal
Applications: Sub Surface Barriers / Product: Jet Grouting

As part of the expansion of the coal terminal storage facilities at Dalrymple, the Industrial dam had to be deepened and enlarged to accommodate greater storage of water for coal washing and other industrial uses. Treating the rock for seepage after excavation posed the problem which Menard Bachy's Grout Curtain Solution proved cost effective whilst also providing greater engineering certainty.

 

 

International Project Summaries

Abu Dhabi Abu Dhabi Business Hub - Phase II - United Arab Emirates
Industrial and Commercial buildings / Dynamic Replacement

Abu Dhabi Business Hub Phase II is the primary phase for constructing the multi purpose warehouse buildings in the Industrial City of Abu Dhabi (ICAD), Mussafah, UAE. This phase with about 60,000 m2 of storage area is intended to meet the requirements of numerous prospective companies that are interested in increasing their storage capacities in Abu Dhabi. The warehouses' slabs on grade were expected to be loaded uniformly to 3,000 kg/m2, and had to settle less than 25 mm under that load.

 
 
Mega Tower - Hong Kong Mega Tower - Hong Kong
Building / Diaphragm wall, barettes, Test

Foundations of the 480 m high Mega Tower : periimetral Wall, Barrettes, Load test (4000t)

 
   
Menard Vacuum Camau - Power Plant - Viet Nam
Heavy Industry (petrochemical, storage) / Menard Vacuum

The initial solution considered by the client was -either to carry out a drain and surcharge solution, but this solution , to be applied very slowly due to very poor soil characteristics , was incompatible with the schedule for part of the plant and was rendered expensive by the need to haul the sand from 200 km away -or to have all structures, including roads, drains, founded on RC square piles (40 to 50 m long): that solution was costly, and did not solve fully the problem of long term settlements (estimated at 1.5 m over the lifetime of the plant).Phase I did represent an area of 90 000 m² and phase II , 70 000 m².

 
   
Menard Vacuum Teesta Dam - India
Cut off / jet grouting and grouting

Upstream and downstream cofferdams. 2 cut-off walls by grouting and jet grouting.

 
   
Vertical Drains Alexandria City Center - Egypt
Industrial and Commercial buildings / Vertical Drains

Due to the important thickness of the fill to be installed to reach the final platform level and to the load of the structure properly speaking , this soft clay layer would have settled , if remained un-treated, of several meters over the life time of the building (consolidation phenomenon) and would have induced unacceptable post construction settlements.

 
 
montevideo Container Terminal, Montevideo
Ports / piling, soil improvement

350 lm berth : deck on pile : container area : reclamation and vibrocompaction

 
   
Menard Vacuum Mud Mountain Dam, USA
Cut off / plastic concrete

Repair of an earth dike, 128 m high and 213 m crest length.

 
   
Dynamic Compaction Al Faq'A & Al Quoa Platform Construction - United Arab Emirates
Industrial and Commercial buildings / Dynamic Compaction

Houses to be built either on areas of "fill" or areas of "cut". All fills initially realized by dumping un-compacted sand. No water table found through thickness treated. The aim of treatment was to increase fill density , in order to limit settlements under future houses, differential settlements for houses implemented partially on fill and partially on cuts , or on fills of variable thickness.Aim was also to insure self bearing criteria , that is to say to avoid that fills settle under their own weight.

 
 
Menard Vacuum Palm Trunk Channel - United Arab Emirates
Water works / Diaphragm wall, Vibro

2.4 km long canal construction on Palm Island, on vibro compacted surface

 
   
Dynamic Compaction A.K.S. sugar silos - Dubaï - United Arab Emirates
Heavy Industry (petrochemical, storage) / Dynamic Compaction

The project is the construction of 2 new sugar silos of 72m hight and 34m diameter MENARD was invited to propose a design and build solution using soil improvement to create a safe and economical foundation system.